• Change text size:
  • A
  • A
  • A

CommercialPrivate Jet Terminal and Hangar


private jet terminal and hangar

private jet terminal and hangar

private jet terminal and hangar
Low and Zero Carbon Solution:
Air to Air Heat Pump Technology

Private Jet Terminal & Hangar


Project: Private Jet Terminal & Hangar
Client: Air Partner Plc
Architect: 3D Reid

description

This stunning design provides a very high quality VIP facility with low CO2 emissions to demonstrate green credentials to a sensitive clientele.  Early modelling of the scheme and close liaison with the architect has achieved a first class result.

The services strategy has been carefully developed to meet the differing needs of travellers and crew plus the maintenance requirements for the hangar.

Dynamic simulation models were used to simulate comfort conditions and to establish low carbon solutions to meet London Planning Requirements.

Benefits

  • Lower lifetime energy costs
  • Improved EPC rating
  • Comfort conditions verified
  • Integrated fabric and services solutions
  • Low carbon solutions identified

 


construction line         ACE          Framework One         Low Carbon Consultants